Previous Next

Engineering prep

Posted on Thu May 13th, 2021 @ 8:47pm by

Mission: The Mentarin Effect
Location: Main engineering
Timeline: Directly following the post titled klingons

James sat in his office thinking about things for all of about ten seconds before he hit his comm terminal. " this is chief Wayne all engineers and damage control teams are to report to your duty station this is not a drill repeat this is not a drill." Said James over the comm channel that was setup directly for use by the engineering department. Truth be told this was likely to be passed off as a drill but if shots were fired at least his department would be ready.

He watched the timer now it would stop when the last man was at his station and ready. Half dressed engineers started arriving in main engineering manning their posts and making minute changes to things to increase protection of key areas of the ship. James looked at the count down clock 3 minutes 25 seconds not a bad time but he wanted a department up to enterprise standards that Kent getting them to under 1 and a half minutes and keeping them there.

" good job everyone but we need to be better team leaders get with your sections and figure out how to get the time down. Also expect the unexpected and be ready for it dismissed." Said James over the comm link he knew is department would like hate him for it but he was hoping they would understand eventually

 

Previous Next

labels_subscribe